Down-lead clamp for tower
1. The download clamp for tower is used to fix the cable tower, the splice tower and terminal in the down-lead to the closure. Each 2 meters is supplied with a set.feeder power cable clamp
2. It is used to fix the tension tower. Each tower is supplied with 2 sets.
Down-lead clamp for pole feeder power cable clamp
1. The downlow clamp for pole is used to fix the cable to the splice pole and criminal pole in the down-lead to the closure. Each 2 meters is supplied with 1 set. feeder power cable clamp
2. It is used for tension pole. Each pole is supplied with 1 set.
Product Description
Unique design feature of our products
feeder power cable clamp
1. Allows the clamp to cover a broad cable range. This feature reduces the customer’s stocking requirements when dealing with numerous cable diameters .feeder power cable clamp
2. The clamp has four attachment options that provide the versatility needed when dealing with a variety of wood or steel poles and lattice towers.feeder power cable clamp
3. Allows the clamp to cover a broad cable range. Normal spacing for down-lead clamps are six to eight feet.
The through type feeder clamp is a kind of combined fixture, it's mainly applied to communication cable, power cable and optical cable. The plastic cable clamp is made of polypropylene, which possesses good impact resistance and chemical resistance, it can protect the cable effectively. The metal part is made of stainless steel, which possesses acid proof and high tenacity. Through the bolt to adjust the clamping force, can prevent the cable to slide.
Specifications
Standard | YD/T 2339.1-2011 |
Application | 1/4, 1/2, 7/8, 5/4, 13/8, 1/2S, etc. |
Clamping Force | ≥10N (Cable Dia.≤16mm)≥20N (Cable Dia.16—28.5mm)≥40N (Cable Dia.>28.5mm) |
Plastic Compression Strength | ≥350N (Cable Dia.≤16mm)≥800N (Cable Dia.>16mm) |
C-Frame Capacity | ≤27mm |
Low Temperature(-40±3℃) | 24 Hours |
High Temperature(70±2℃) | 24 Hours |
Salt Spray Chamber (Neutral) | ≥96 Hours |
UV Resistance | 72 Hours |
2011/65/EC (RoHS) | Compliant |
1-5/8"x1 Double-hole type, 1-5/8"x2 Double-hole type, 1-5/8"x3 Double-hole type, etc..
FAQ
Cable Wire Stainless Down-lead Cable Clamp
Q: How long is your delivery time?
A: In stock or 7 days after your prepayment. feeder power cable clamp
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample but it is extra because our product is a complete set and costly.
Q: What is your terms of payment?
A: 30% in advance, and 70% at deposit by L/C, T/T, Western Union, Money Gram, Paypal and Trade assurance of alibaba or other ways.
Q: Can I get a discount?
A: We will give you appropriate discount for our long-term and friendly relation.
Q: When will you get the quotation?
A: One day. feeder power cable clamp
Q: What is the MOQ?
A: One set. feeder power cable clamp
Q: What's the advantage of your products? Because I found some cheaper product from others.
A: Our products are high quality customized, our service is unparalleled and comprehensive consideration is the best way.
Q: Why choose us?feeder power cable clamp
• Excellent quality and reasonable price. down lead clamp
• Trust able business credit. down lead clamp
• Greatest sincerity. down lead clamp